refactor parallel rebalancer. can now retain data structures to avoid… #161
branch_ci.yml
on: push
Test Suite
2m 48s
C Interface Tests
6m 21s
Python Interface Tests
4m 5s
Matrix: Ubuntu Build
Annotations
6 errors
Ubuntu Build (ubuntu-20.04, g++-11, gcc-11, g++-11 gcc-11)
Process completed with exit code 100.
|
Ubuntu Build (ubuntu-22.04, clang++, clang, clang)
The job was canceled because "ubuntu-20_04_g__-11_gcc-11_g__-11_gcc-11" failed.
|
Ubuntu Build (ubuntu-22.04, clang++, clang, clang)
The operation was canceled.
|
Test Suite
Process completed with exit code 2.
|
Python Interface Tests
Process completed with exit code 1.
|
C Interface Tests
Process completed with exit code 2.
|