Skip to content

fix hook name

fix hook name #1092

Triggered via push August 10, 2023 20:44
Status Failure
Total duration 6h 5m 14s
Artifacts 2

ci.yaml

on: push
build mirrord
3m 6s
build mirrord
test_agent_image
44s
test_agent_image
Matrix: test_mirrord_layer_cli
check-rust-docs
3m 48s
check-rust-docs
test_mirrord_kube
46s
test_mirrord_kube
integration_tests
5m 34s
integration_tests
Matrix: e2e
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 10 warnings
integration_tests
Process completed with exit code 101.
integration_tests_macos
Process completed with exit code 101.
e2e (containerd)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
e2e (containerd)
The operation was canceled.
e2e (docker)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
e2e (docker)
The operation was canceled.
ci
Process completed with exit code 1.
check-rust-docs: mirrord/macros/src/lib.rs#L9
`protocol_break` is both a function and an attribute macro
check-rust-docs: mirrord/protocol/src/outgoing.rs#L111
unresolved link to `RemoteError::ConnectTimeOut`
check-rust-docs: mirrord/config/src/lib.rs#L7
unresolved link to `tests::check_schema_file_exists_and_is_valid_or_create_it`
check-rust-docs: mirrord/config/src/feature/fs.rs#L8
unresolved link to `mirrord_layer::file::filter::FileFilter`
check-rust-docs: mirrord/config/src/feature/network/incoming.rs#L210
this URL is not a hyperlink
check-rust-docs: mirrord/progress/src/lib.rs#L33
unresolved link to `TaskProgress`
check-rust-docs: tests/src/utils.rs#L642
unresolved link to `FORCE_CLEANUP_ENV_NAME`
check-rust-docs: tests/src/utils.rs#L883
unclosed HTML tag `DATA`
check-rust-docs: tests/src/utils.rs#L898
unclosed HTML tag `DATA`
check-rust-docs: tests/src/utils.rs#L927
unclosed HTML tag `DATA`

Artifacts

Produced during runtime
Name Size
mirrord-artifacts Expired
140 MB
test Expired
68.5 MB