Skip to content

🌱 Bump the k8s.io/* deps to v0.29.11 #1120

🌱 Bump the k8s.io/* deps to v0.29.11

🌱 Bump the k8s.io/* deps to v0.29.11 #1120

Triggered via pull request November 24, 2024 21:28
Status Cancelled
Total duration 16m 22s
Artifacts 1

pipeline.yml

on: pull_request
Matrix: golangci-lint / lint
e2e-fixture-test  /  E2E fixture test
13m 50s
e2e-fixture-test / E2E fixture test
Matrix: e2e-test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
e2e-test (ipmi) / E2E test
Process completed with exit code 90.
e2e-test (redfish-virtualmedia) / E2E test
FailFast: cancelling since parallel instance has failed
e2e-test (redfish-virtualmedia) / E2E test
The operation was canceled.

Artifacts

Produced during runtime
Name Size
artifacts-fixture.tar.gz
121 KB