Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

wip Debug parallel pipeline #1635

Open
wants to merge 1 commit into
base: main
Choose a base branch
from

Conversation

mboukhalfa
Copy link
Member

wip

@metal3-io-bot metal3-io-bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Apr 30, 2024
@metal3-io-bot
Copy link
Contributor

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
Once this PR has been reviewed and has the lgtm label, please ask for approval from mboukhalfa. For more information see the Kubernetes Code Review Process.

The full list of commands accepted by this bot can be found here.

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@mboukhalfa
Copy link
Member Author

/test ?

@metal3-io-bot
Copy link
Contributor

@mboukhalfa: The following commands are available to trigger required jobs:

  • /test build
  • /test generate
  • /test gomod
  • /test manifestlint
  • /test markdownlint
  • /test metal3-centos-e2e-integration-test-main
  • /test metal3-ubuntu-e2e-integration-test-main
  • /test shellcheck
  • /test test
  • /test unit

The following commands are available to trigger optional jobs:

  • /test metal3-centos-e2e-basic-test-main
  • /test metal3-centos-e2e-feature-test-main
  • /test metal3-e2e-1-26-1-27-upgrade-test-main
  • /test metal3-e2e-1-27-1-28-upgrade-test-main
  • /test metal3-e2e-1-28-1-29-upgrade-test-main
  • /test metal3-e2e-clusterctl-upgrade-test-main
  • /test metal3-ubuntu-e2e-basic-test-main
  • /test metal3-ubuntu-e2e-feature-test-main

Use /test all to run the following jobs that were automatically triggered:

  • build
  • generate
  • gomod
  • manifestlint
  • shellcheck
  • test
  • unit

In response to this:

/test ?

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@metal3-io-bot metal3-io-bot added the size/S Denotes a PR that changes 10-29 lines, ignoring generated files. label Apr 30, 2024
@mboukhalfa
Copy link
Member Author

/test metal3-centos-e2e-feature-test-main

Signed-off-by: Mohammed Boukhalfa <mohammed.boukhalfa@est.tech>
@mboukhalfa mboukhalfa force-pushed the debug-parallel-pipeline/mohammed branch from 22748b0 to 54b79b4 Compare May 2, 2024 12:48
@metal3-io-bot metal3-io-bot added size/M Denotes a PR that changes 30-99 lines, ignoring generated files. and removed size/S Denotes a PR that changes 10-29 lines, ignoring generated files. labels May 2, 2024
@mboukhalfa
Copy link
Member Author

/test metal3-centos-e2e-feature-test-main

1 similar comment
@mboukhalfa
Copy link
Member Author

/test metal3-centos-e2e-feature-test-main

@tuminoid
Copy link
Member

/retest
Checking CI

@tuminoid
Copy link
Member

/retest
maybe after metal3-io/project-infra#758 this would now work?

@metal3-io-bot
Copy link
Contributor

Issues go stale after 90d of inactivity.
Mark the issue as fresh with /remove-lifecycle stale.
Stale issues will close after an additional 30d of inactivity.

If this issue is safe to close now please do so with /close.

/lifecycle stale

@metal3-io-bot metal3-io-bot added the lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. label Aug 14, 2024
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

None yet

3 participants