Reorganize the tests into unit/functional/integration/external #52
Triggered via pull request
November 19, 2023 23:08
Status
Cancelled
Total duration
10m 32s
Artifacts
–
ci.yml
on: pull_request
pre-commit
/
pre-commit
14s
pre-commit
/
lint-extension
1m 54s
Matrix: test-conda / test-conda
Matrix: test-pip / test-pip
pass
1s
Annotations
23 errors and 3 warnings
test-conda / test-conda (ubuntu-latest, 3.9)
The process '/usr/share/miniconda/condabin/conda' failed with exit code 1
|
test-conda / test-conda (macos-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
|
test-conda / test-conda (macos-latest, 3.9)
The operation was canceled.
|
test-conda / test-conda (windows-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
|
test-conda / test-conda (windows-latest, 3.9)
The operation was canceled.
|
test-pip / test-pip (3.11, ~=4.0, true)
Process completed with exit code 1.
|
test-ui / test-ui
Process completed with exit code 127.
|
test-pip / test-pip (3.13-dev, true)
Process completed with exit code 1.
|
test-pip / test-pip (3.x, false)
Process completed with exit code 2.
|
test-pip / test-pip (3.12-dev, true)
Process completed with exit code 2.
|
test-pip / test-pip (3.x)
Process completed with exit code 2.
|
test-pip / test-pip (3.x, true, true)
Process completed with exit code 2.
|
test-pip / test-pip (3.x, false)
Process completed with exit code 2.
|
test-pip / test-pip (3.x, ~=3.0)
Process completed with exit code 2.
|
test-pip / test-pip (3.10, ~=2.0, true, true)
Canceling since a higher priority waiting request for 'CI-refs/pull/1155/merge' exists
|
test-pip / test-pip (3.10, ~=2.0, true, true)
The operation was canceled.
|
test-pip / test-pip (3.9, ~=2.0, true, true)
Canceling since a higher priority waiting request for 'CI-refs/pull/1155/merge' exists
|
test-pip / test-pip (3.9, ~=2.0, true, true)
The operation was canceled.
|
test-pip / test-pip (3.11, ~=2.0, true, true)
Canceling since a higher priority waiting request for 'CI-refs/pull/1155/merge' exists
|
test-pip / test-pip (3.11, ~=2.0, true, true)
The operation was canceled.
|
test-pip / test-pip (3.8, ~=2.0, true, true)
Canceling since a higher priority waiting request for 'CI-refs/pull/1155/merge' exists
|
test-pip / test-pip (3.8, ~=2.0, true, true)
The operation was canceled.
|
pass
Process completed with exit code 1.
|
pre-commit / lint-extension:
jupyterlab/packages/jupyterlab-jupytext-extension/src/index.ts#L378
Forbidden non-null assertion
|
test-conda / test-conda (ubuntu-latest, 3.9)
ResolvePackageNotFound:
- jupyterlab[version='>=4.0.0']
- nodejs[version='>=20']
|
test-ui / test-ui
No files were found with the provided path: jupyterlab/packages/jupyterlab-jupytext-extension/ui-tests/test-results. No artifacts will be uploaded.
|