Skip to content

Reorganize the tests into unit/functional/integration/external #66

Reorganize the tests into unit/functional/integration/external

Reorganize the tests into unit/functional/integration/external #66

Triggered via pull request November 23, 2023 19:19
Status Cancelled
Total duration 20m 28s
Artifacts

ci.yml

on: pull_request
pre-commit  /  pre-commit
18s
pre-commit / pre-commit
pre-commit  /  lint-extension
1m 53s
pre-commit / lint-extension
Matrix: test-conda / test-conda
Matrix: test-pip / test-pip
Matrix: test-unit-functional-integration / test-pip
build  /  build
build / build
Fit to window
Zoom out
Zoom in

Annotations

7 errors, 1 warning, and 1 notice
test-pip / test-pip (3.x, ~=4.0, true)
Process completed with exit code 1.
test-pip / test-pip (3.13-dev, true)
Process completed with exit code 1.
test-conda / test-conda (windows-latest, 3.11)
Canceling since a higher priority waiting request for 'CI-refs/pull/1155/merge' exists
test-conda / test-conda (windows-latest, 3.11)
The operation was canceled.
test-conda / test-conda (macos-latest, 3.11)
Canceling since a higher priority waiting request for 'CI-refs/pull/1155/merge' exists
test-conda / test-conda (macos-latest, 3.11)
The operation was canceled.
pass
Process completed with exit code 1.
🎭 Playwright Run Summary
16 passed (2.1m)