Skip to content
Triggered via pull request March 17, 2024 05:26
@nameexhaustionnameexhaustion
synchronize #18
cc
Status Cancelled
Total duration 3m 51s
Artifacts

test-rust.yml

on: pull_request
Matrix: integration-test
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
integration-test (ubuntu-latest)
Process completed with exit code 101.
integration-test (windows-latest)
The job was canceled because "ubuntu-latest" failed.
integration-test (windows-latest)
The operation was canceled.
test (windows-latest)
Canceling since a higher priority waiting request for 'Test Rust-refs/pull/18/merge' exists
test (windows-latest)
The operation was canceled.
check-wasm
Canceling since a higher priority waiting request for 'Test Rust-refs/pull/18/merge' exists
check-wasm
The operation was canceled.
test (ubuntu-latest)
Canceling since a higher priority waiting request for 'Test Rust-refs/pull/18/merge' exists
test (ubuntu-latest)
The operation was canceled.
check-features
Canceling since a higher priority waiting request for 'Test Rust-refs/pull/18/merge' exists
check-features
The operation was canceled.