Skip to content

chore(deps): bump cachix/install-nix-action from 25 to 26 #136

chore(deps): bump cachix/install-nix-action from 25 to 26

chore(deps): bump cachix/install-nix-action from 25 to 26 #136

Status Failure
Total duration 1m 19s
Artifacts

continuous-integration.yml

on: pull_request
Matrix: build-and-test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build-and-test (ubuntu-latest, stable)
Process completed with exit code 1.
build-and-test (macos-latest, stable)
The job was canceled because "ubuntu-latest_stable" failed.
build-and-test (macos-latest, stable)
The operation was canceled.