Skip to content

odds-get-evened/taber

Repository files navigation

taber

by Christopher Walsh

business plan for a self-sustaining smart farm & data-center

components

  • servers for data processing software, and data storage
  • industrial space
  • power requirements? wind/solar generators, and infrastructure (100% sustainable)
  • cooling (fans, water source, air quality management)
  • physical security (employee badge access to video surveillance)
  • building management system (BMS) (for monitoring the space's environment and controlling it)

infrastructure needs

  • servers
  • disk storage
  • networking
  • cables and racks
  • uninterruptible power (UPS)
  • software based management platforms (for reporting on system health, availability, capacity and configuration)

things to consider

  • Uptime Institute Tier Standard - redundancy/reliability
  • ANSI/TIA 942-B - planning, design, construction and commissioning of building trades, as well as fire protection, IT and maintenance
  • EN 50600 series - IT cable and network design
  • ASHRAE - design and implementation of heating, ventilation, air conditioning, refrigeration

related documents:

Title
Business Plan link
Technology Costs link
Usage of AI for Optimizing Operating Efficiencies link
Data Center Layout & Heat Management link
BOM link
Why Smart Farming? link
Boosting economies link

Christopher Walsh

signature: 70020ac35828180915051b1c8092e9056486fd0c5a72f8167d2681b409db220f

Releases

No releases published

Packages

No packages published