feat: Add working-directory to the target, group and global scope #159
main.yaml
on: pull_request
linter-and-docs
2m 55s
Matrix: tests
Annotations
11 errors
linter-and-docs
Process completed with exit code 1.
|
tests (3.10, ubuntu)
Process completed with exit code 1.
|
tests (3.10, macos)
The job was canceled because "_3_10_ubuntu" failed.
|
tests (3.8.1, ubuntu)
The job was canceled because "_3_10_ubuntu" failed.
|
tests (3.8.1, ubuntu)
The operation was canceled.
|
tests (3.9, macos)
The job was canceled because "_3_10_ubuntu" failed.
|
tests (3.9, macos)
The operation was canceled.
|
tests (3.9, ubuntu)
The job was canceled because "_3_10_ubuntu" failed.
|
tests (3.9, ubuntu)
The operation was canceled.
|
tests (3.8.1, macos)
The job was canceled because "_3_10_ubuntu" failed.
|
tests (3.8.1, macos)
The operation was canceled.
|