Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

lightning: revert new policy of allocating rowid and refine it later #35817

Merged
merged 3 commits into from
Jun 29, 2022

Conversation

buchuitoudegou
Copy link
Contributor

@buchuitoudegou buchuitoudegou commented Jun 29, 2022

What problem does this PR solve?

Issue Number: close #35816

Problem Summary:
temporarily revert the previous pr and refine it.

What is changed and how it works?

Check List

Tests

Side effects

Documentation

Release note

Please refer to Release Notes Language Style Guide to write a quality release note.

None

@ti-chi-bot
Copy link
Member

ti-chi-bot commented Jun 29, 2022

[REVIEW NOTIFICATION]

This pull request has been approved by:

  • gozssky
  • lichunzhu

To complete the pull request process, please ask the reviewers in the list to review by filling /cc @reviewer in the comment.
After your PR has acquired the required number of LGTMs, you can assign this pull request to the committer in the list by filling /assign @committer in the comment to help you merge this pull request.

The full list of commands accepted by this bot can be found here.

Reviewer can indicate their review by submitting an approval review.
Reviewer can cancel approval by submitting a request changes review.

@ti-chi-bot ti-chi-bot added release-note-none Denotes a PR that doesn't merit a release note. do-not-merge/needs-triage-completed size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. labels Jun 29, 2022
@buchuitoudegou
Copy link
Contributor Author

/run-integration-br-test

@buchuitoudegou
Copy link
Contributor Author

/cc @D3Hunter
/cc @gozssky

@sre-bot
Copy link
Contributor

sre-bot commented Jun 29, 2022

@ti-chi-bot ti-chi-bot added the status/LGT1 Indicates that a PR has LGTM 1. label Jun 29, 2022
@sleepymole
Copy link
Contributor

/run-integration-br-test

@ti-chi-bot ti-chi-bot added status/LGT2 Indicates that a PR has LGTM 2. and removed status/LGT1 Indicates that a PR has LGTM 1. labels Jun 29, 2022
@sleepymole
Copy link
Contributor

/merge

@ti-chi-bot
Copy link
Member

This pull request has been accepted and is ready to merge.

Commit hash: ea66c18

@ti-chi-bot ti-chi-bot added the status/can-merge Indicates a PR has been approved by a committer. label Jun 29, 2022
@sleepymole
Copy link
Contributor

/run-mysql-test

@ti-chi-bot ti-chi-bot merged commit 680b78c into pingcap:master Jun 29, 2022
@sre-bot
Copy link
Contributor

sre-bot commented Jun 29, 2022

TiDB MergeCI notify

🔴 Bad News! [2] CI still failing after this pr merged.
These failed integration tests don't seem to be introduced by the current PR.

CI Name Result Duration Compare with Parent commit
idc-jenkins-ci-tidb/integration-common-test 🔴 failed 2, success 9, total 11 19 min Existing failure
idc-jenkins-ci-tidb/common-test 🔴 failed 1, success 11, total 12 13 min Existing failure
idc-jenkins-ci/integration-cdc-test 🟢 all 35 tests passed 29 min Existing passed
idc-jenkins-ci-tidb/integration-ddl-test 🟢 all 6 tests passed 6 min 32 sec Existing passed
idc-jenkins-ci-tidb/tics-test 🟢 all 1 tests passed 6 min 4 sec Existing passed
idc-jenkins-ci-tidb/sqllogic-test-2 🟢 all 28 tests passed 5 min 40 sec Existing passed
idc-jenkins-ci-tidb/sqllogic-test-1 🟢 all 26 tests passed 5 min 8 sec Existing passed
idc-jenkins-ci-tidb/mybatis-test 🟢 all 1 tests passed 3 min 28 sec Existing passed
idc-jenkins-ci-tidb/integration-compatibility-test 🟢 all 1 tests passed 3 min 0 sec Existing passed
idc-jenkins-ci-tidb/plugin-test 🟢 build success, plugin test success 4min Existing passed

morgo added a commit to morgo/tidb that referenced this pull request Jun 29, 2022
…vars

* upstream/master: (28 commits)
  *: enable unconvert (pingcap#35821)
  log-backup: check timezone when using datatime format ts string (pingcap#35811)
  planner: support the leading hint for outer join (pingcap#35264)
  lightning: revert new policy of allocating rowid and refine it later (pingcap#35817)
  txn: manage the initialization of RCCheckTS by transaction context provider (pingcap#35554)
  ddl: make output field name in `show tables/databases stmt` compatible with mysql (pingcap#35136)
  txn: remove `legacy.SimpleTxnContextProvider` (pingcap#35667)
  txn: fix the error message if retry could not be used for rc check ts (pingcap#35474)
  *: support canceling DDL statements with KILL (pingcap#35803)
  lightning: avoid extracting db schema when schema file is not provided (pingcap#35783)
  *: enable all gosimples (pingcap#35762)
  tools/check: skip 'tests' directory in 'make ut' (pingcap#35800)
  metrics: add loading region cache duration (pingcap#34679)
  ddl: DROP TABLE/VIEW/SEQUENCE now use XXXStmt as parameter (pingcap#35741)
  types: fix incompatible implementation of jsonpath extraction (pingcap#35320)
  planner: fix TRACE PLAN TARGET = 'estimation' panic when meeting partition table (pingcap#35743)
  *: Add `testfork.RunTest` to run multiple tests in one function (pingcap#35746)
  sessionctx/variable: add tests to ensure skipInit can be removed (pingcap#35703)
  helper: request another PD if one of them is unavailable (pingcap#35750)
  metrics: add cached table related metrics to grafana panel (pingcap#34718)
  ...
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. status/can-merge Indicates a PR has been approved by a committer. status/LGT2 Indicates that a PR has LGTM 2.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

lightning: revert new rowID allocation and refine it
5 participants