Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

br: restore checksum shouldn't rely on backup checksum (#56712) #58335

Open
wants to merge 1 commit into
base: release-6.5
Choose a base branch
from

Conversation

ti-chi-bot
Copy link
Member

This is an automated cherry-pick of #56712

What problem does this PR solve?

Issue Number: close #56373

Problem Summary:

What changed and how does it work?

  1. Disable checksum by default only for snapshot backup process.
  2. Keep checksum enabled for the rest
  3. During snapshot restore, verify admin checksum by doing xor on all meta file checksums, so it doesn't rely on backup generating the CRC for the database.

Check List

Tests

  • Unit test
  • Integration test
  • Manual test (add detailed scripts or steps below)
  • No need to test
    • I checked and no code files have been changed.

Side effects

  • Performance regression: Consumes more CPU
  • Performance regression: Consumes more Memory
  • Breaking backward compatibility

Documentation

  • Affects user behaviors
  • Contains syntax changes
  • Contains variable changes
  • Contains experimental features
  • Changes MySQL compatibility

Release note

Please refer to Release Notes Language Style Guide to write a quality release note.

The default behavior of doing checksum during full backup has changed from enabled to disabled. 
The meaning of checksum flag is kind of ambiguous here, it doesn't mean we don't do the checksum of files when doing backup, instead we don't do checksum to compare from coprocessor side to the br side to improve the performance

Signed-off-by: ti-chi-bot <ti-community-prow-bot@tidb.io>
@ti-chi-bot ti-chi-bot added ok-to-test Indicates a PR is ready to be tested. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-6.5 This PR is cherry-picked to release-6.5 from a source PR. labels Dec 17, 2024
Copy link

ti-chi-bot bot commented Dec 17, 2024

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
Once this PR has been reviewed and has the lgtm label, please assign 3pointer for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@ti-chi-bot ti-chi-bot bot added size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. and removed size/L Denotes a PR that changes 100-499 lines, ignoring generated files. labels Dec 17, 2024
Copy link

ti-chi-bot bot commented Dec 17, 2024

@ti-chi-bot: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
idc-jenkins-ci-tidb/check_dev_2 ac7f0e9 link true /test check-dev2
idc-jenkins-ci-tidb/unit-test ac7f0e9 link true /test unit-test
idc-jenkins-ci-tidb/check_dev ac7f0e9 link true /test check-dev
idc-jenkins-ci-tidb/mysql-test ac7f0e9 link true /test mysql-test
idc-jenkins-ci-tidb/build ac7f0e9 link true /test build

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository. I understand the commands that are listed here.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
cherry-pick-approved Cherry pick PR approved by release team. ok-to-test Indicates a PR is ready to be tested. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-6.5 This PR is cherry-picked to release-6.5 from a source PR.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants