You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
For simulated node YAML tests, commissioning must complete before testing starts. Some controller certification tests will need to test their ability to walk through node commissioning flow. Therefore, weather commissioning should occur pre-test or not should be up to the script writer.
Proposed Solution
Add a config in YAML or runtime flag to specify weather commissioning should occur prior to a simulated node test's start or not.
The text was updated successfully, but these errors were encountered:
Problem
For simulated node YAML tests, commissioning must complete before testing starts. Some controller certification tests will need to test their ability to walk through node commissioning flow. Therefore, weather commissioning should occur pre-test or not should be up to the script writer.
Proposed Solution
Add a config in YAML or runtime flag to specify weather commissioning should occur prior to a simulated node test's start or not.
The text was updated successfully, but these errors were encountered: