Skip to content

Fix it better ;)

Fix it better ;) #108

Re-run triggered September 22, 2023 09:46
Status Cancelled
Total duration 3m 4s
Artifacts 1

run-tests.yml

on: push
Matrix: Integration and Unit tests
Acceptance tests
35s
Acceptance tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Integration and Unit tests (1.18.9)
The run was canceled by @github-actions.
Integration and Unit tests (1.18.9)
The operation was canceled.
Integration and Unit tests (1.16.15)
The run was canceled by @github-actions.
Integration and Unit tests (1.16.15)
The operation was canceled.
Acceptance tests
Process completed with exit code 1.
Integration and Unit tests (1.19.4)
The run was canceled by @github-actions.
Integration and Unit tests (1.19.4)
The operation was canceled.
Integration and Unit tests (1.17.13)
The run was canceled by @github-actions.
Integration and Unit tests (1.17.13)
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
acceptance-test-reports Expired
67.8 KB