PF integration tests using pulumitest #4162
You are viewing an older attempt in the history of this workflow run.
View latest attempt.
ci.yml
on: pull_request
Test and Lint
/
lint
2m 36s
Ensure test assets build cleanly
57s
Matrix: Test and Lint / test
Annotations
11 errors
Test and Lint / test (1.21.x, ubuntu-latest)
Process completed with exit code 2.
|
Test and Lint / test (1.21.x, windows-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
Test and Lint / test (1.21.x, windows-latest)
The operation was canceled.
|
Test and Lint / test (1.22.x, windows-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
Test and Lint / test (1.22.x, windows-latest)
The operation was canceled.
|
Test and Lint / test (1.22.x, macos-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
Test and Lint / test (1.22.x, macos-latest)
The operation was canceled.
|
Test and Lint / test (1.22.x, ubuntu-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
Test and Lint / test (1.22.x, ubuntu-latest)
The operation was canceled.
|
Test and Lint / test (1.21.x, macos-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
Test and Lint / test (1.21.x, macos-latest)
The operation was canceled.
|