Skip to content
This repository has been archived by the owner on Nov 26, 2020. It is now read-only.

Add GHA checks for the Clippy Repo #578

Merged
merged 2 commits into from
Feb 19, 2020

Conversation

flip1995
Copy link
Member

@flip1995 flip1995 commented Feb 7, 2020

This adds 3 checks for the Clippy repos move to GHA. The dummy jobs for bors, are added in rust-lang/rust-clippy@1a83b7a. This is split up in 3 different jobs, because we run the remark and the dev (both take <~1min) checks also on PRs, but the bors test (15~17min, across 21 dependent jobs, with a limit of 10 jobs at a time) only on bors builds.

r? @pietroalbini

Is there anything else to do, to get GHA to work with bors?


Clippy is currently in the Test phase of GHA. Until then we want to only gate on Travis+AppVeyor, as suggested by @pietroalbini We're ready to move rust-lang/rust-clippy#5190

@pietroalbini pietroalbini self-assigned this Feb 7, 2020
bors added a commit to rust-lang/rust-clippy that referenced this pull request Feb 7, 2020
[WIP] Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [x] ~~Get remark + clippy_dev check to work on pushes (https://git.luolix.topmunity/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142~~ We need to run the bors tests unconditionally anyway (47138d1) so it doesn't really matter.
- [ ] impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass. The bors dummy jobs are added in 1a83b7a and work as expected: #5088 (comment). I opened rust-lang/rust-central-station#578
- [x] ~Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)~ Added a FIXME in
2332b57
- [x] ~Maybe we should also wait until GHA supports yaml anchors. https://git.luolix.topmunity/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/~ WIll probably not be implemented in the near future.
- [x] Add back travis + appveyor files for transition period (!)

changelog: none
@flip1995 flip1995 changed the title [WIP] Add GHA checks for the Clippy Repo Add GHA checks for the Clippy Repo Feb 7, 2020
@flip1995 flip1995 changed the title Add GHA checks for the Clippy Repo [DNM] Add GHA checks for the Clippy Repo Feb 11, 2020
bors added a commit to rust-lang/rust-clippy that referenced this pull request Feb 12, 2020
Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [x] ~~Get remark + clippy_dev check to work on pushes (https://git.luolix.topmunity/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday. Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142~~ We need to run the bors tests unconditionally anyway (47138d1) so it doesn't really matter.
- [x] ~~impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass. The bors dummy jobs are added in 1a83b7a and work as expected: #5088 (comment). I opened rust-lang/rust-central-station#578 See #5088 (comment)
- [x] ~Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)~ Added a FIXME in
2332b57
- [x] ~Maybe we should also wait until GHA supports yaml anchors. https://git.luolix.topmunity/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/~ WIll probably not be implemented in the near future.
- [x] Add back travis + appveyor files for transition period (!)

changelog: none
bors added a commit to rust-lang/rust-clippy that referenced this pull request Feb 12, 2020
Switch to GitHub Actions - Part 2 - From within

This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks.

Copying the description of #5071 to here:

Closes #4577

~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment)

~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs.

~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout).

TODO before merge:

- [x] Add `DEPLOY_KEY` secret to github repo
- [x] test deployment on test branch `gh-test`#
  - [x] Test normal deployment
  - [x] Test deployment no changes
  - [x] Test deployment of tag
- [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors)
- [x] ~~Get remark + clippy_dev check to work on pushes (https://git.luolix.topmunity/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday. Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142~~ We need to run the bors tests unconditionally anyway (47138d1) so it doesn't really matter.
- [x] ~~impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass. The bors dummy jobs are added in 1a83b7a and work as expected: #5088 (comment). I opened rust-lang/rust-central-station#578 See #5088 (comment)
- [x] ~Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)~ Added a FIXME in
2332b57
- [x] ~Maybe we should also wait until GHA supports yaml anchors. https://git.luolix.topmunity/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/~ WIll probably not be implemented in the near future.
- [x] Add back travis + appveyor files for transition period (!)

changelog: none
@flip1995 flip1995 changed the title [DNM] Add GHA checks for the Clippy Repo Add GHA checks for the Clippy Repo Feb 19, 2020
@pietroalbini pietroalbini merged commit 66b8281 into rust-lang:master Feb 19, 2020
bors added a commit to rust-lang/rust-clippy that referenced this pull request Feb 19, 2020
…logiq,flip1995

I like to move it, move it

GHA now runs in the background for 6 days (#5088)

Since then ~~15~~ 19 PRs were successfully merged and Travis+Appveyor agreed on the status in every case. ([GitHub PR search query](https://github.com/rust-lang/rust-clippy/pulls?utf8=%E2%9C%93&q=is%3Apr+is%3Amerged+merged%3A%3E%3D2020-02-12T15%3A42%3A00+sort%3Aupdated-desc+NOT+%5Bgh-pages%5D+in%3Atitle))

Some PRs were:
- #5163
- #5170
- #5168
- #5173
- #5171
- #5156
- #4809
- #5177
- #5182
- #5183
- #5184
- #5185
- #5186
- #5181
- #5189

Bug with GHA:
- When a rustc PR gets merged between the `integration_build` and the `integration` job, the `integration` job will fail. This happened once in #5162, but not in the past 6 days. Even if it would happen every 4th PR we would save time, since splitting up the integration build and tests saves 5-7 minutes per run and a complete run takes 15-17 minutes
- Sometimes the MacOS build takes up to an hour to download the master toolchain. Until now, this happend 2 or 3 times and can be resolved by a `@bors r3try`+canceling the previous run (restarting single jobs is not supported yet)

## Before merging this, rust-lang/rust-central-station#578 has to get merged

This PR is for starting the discussion and to get consensus (@rust-lang/clippy) on a final move to GHA. If we're ready, I'll contact Pietro, to finalize the move.

changelog: Clippy completely runs on GHA now 🎉

---

BTW: The deployment already runs on GHA, instead of Travis.
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants