Skip to content

Using Machine Learning Model to predict the Net hourly Electrical Energy Output from the Combined Cycle Power Plant Data Set collected over a span of 5 years.

Notifications You must be signed in to change notification settings

sayon-som/EP-PREDICTOR

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

4 Commits
 
 
 
 
 
 

Repository files navigation

EP-PREDICTOR

Using Machine Learning Model to predict the Net hourly Electrical Energy Output from the Combined Cycle Power Plant Data Set collected over a span of 6 years.

Data Set Information:

The dataset contains 9568 data points collected from a Combined Cycle Power Plant over 6 years (2006-2011), when the power plant was set to work with full load. Features consist of hourly average ambient variables Temperature (T), Ambient Pressure (AP), Relative Humidity (RH) and Exhaust Vacuum (V) to predict the net hourly electrical energy output (EP) of the plant. A combined cycle power plant (CCPP) is composed of gas turbines (GT), steam turbines (ST) and heat recovery steam generators. In a CCPP, the electricity is generated by gas and steam turbines, which are combined in one cycle, and is transferred from one turbine to another. While the Vacuum is colected from and has effect on the Steam Turbine, he other three of the ambient variables effect the GT performance. For comparability with our baseline studies, and to allow 5x2 fold statistical tests be carried out, we provide the data shuffled five times. For each shuffling 2-fold CV is carried out and the resulting 10 measurements are used for statistical testing.

Attribute Information:

Features consist of hourly average ambient variables

  • Temperature (T) in the range 1.81°C and 37.11°C,
  • Ambient Pressure (AP) in the range 992.89-1033.30 milibar,
  • Relative Humidity (RH) in the range 25.56% to 100.16%
  • Exhaust Vacuum (V) in teh range 25.36-81.56 cm Hg
  • Net hourly electrical energy output (EP) 420.26-495.76 MW

About

Using Machine Learning Model to predict the Net hourly Electrical Energy Output from the Combined Cycle Power Plant Data Set collected over a span of 5 years.

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Languages