Skip to content

Add lora_path to chat completion (#2438) #3110

Add lora_path to chat completion (#2438)

Add lora_path to chat completion (#2438) #3110

Triggered via push December 17, 2024 11:47
Status Failure
Total duration 13m 37s
Artifacts

pr-test.yml

on: push
Matrix: unit-test-backend-1-gpu
unit-test-frontend
3m 21s
unit-test-frontend
unit-test-backend-2-gpu
12m 58s
unit-test-backend-2-gpu
performance-test-1-gpu-part-1
9m 38s
performance-test-1-gpu-part-1
performance-test-1-gpu-part-2
11m 11s
performance-test-1-gpu-part-2
performance-test-2-gpu
9m 14s
performance-test-2-gpu
accuracy-test-1-gpu
5m 26s
accuracy-test-1-gpu
accuracy-test-2-gpu
6m 20s
accuracy-test-2-gpu
Fit to window
Zoom out
Zoom in

Annotations

10 errors
accuracy-test-2-gpu
Process completed with exit code 1.
unit-test-backend-1-gpu (23-30)
Process completed with exit code 1.
unit-test-backend-1-gpu (0-6)
The job was canceled because "_23-30" failed.
unit-test-backend-1-gpu (0-6)
The operation was canceled.
unit-test-backend-1-gpu (30-100)
The job was canceled because "_23-30" failed.
unit-test-backend-1-gpu (30-100)
The operation was canceled.
unit-test-backend-1-gpu (6-15)
The job was canceled because "_23-30" failed.
unit-test-backend-1-gpu (6-15)
The operation was canceled.
unit-test-backend-1-gpu (15-23)
The job was canceled because "_23-30" failed.
unit-test-backend-1-gpu (15-23)
The operation was canceled.