Skip to content

chore(deps): update dependency chromatic to ^11.10.4 (#18353) #18314

chore(deps): update dependency chromatic to ^11.10.4 (#18353)

chore(deps): update dependency chromatic to ^11.10.4 (#18353) #18314

Triggered via push September 25, 2024 07:15
Status Failure
Total duration 5m 44s
Artifacts 2

docker.yml

on: push
Matrix: Docker Build, Tag, Push
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Docker Build, Tag, Push (csi)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c CGO_ENABLED=0 GOOS=$TARGETOS GOARCH=$TARGETARCH go build -a -pgo=${PGO_PATH} -gcflags=\"${SKAFFOLD_GO_GCFLAGS}\" -ldflags \"-s -w -X main.CI_COMMIT_TAG=$CI_COMMIT_TAG\" -installsuffix cgo -trimpath -o app $CMD_PATH" did not complete successfully: exit code: 1
Docker Build, Tag, Push (logger)
The job was canceled because "csi" failed.
Docker Build, Tag, Push (logger)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c CGO_ENABLED=0 GOOS=$TARGETOS GOARCH=$TARGETARCH go build -a -pgo=${PGO_PATH} -gcflags=\"${SKAFFOLD_GO_GCFLAGS}\" -ldflags \"-s -w -X main.CI_COMMIT_TAG=$CI_COMMIT_TAG\" -installsuffix cgo -trimpath -o app $CMD_PATH" did not complete successfully: exit code: 1
Docker Build, Tag, Push (metadata)
The job was canceled because "csi" failed.
Docker Build, Tag, Push (metadata)
The operation was canceled.
Docker Build, Tag, Push (link)
The job was canceled because "csi" failed.
Docker Build, Tag, Push (link)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
shortlink-org~shortlink~RUW8UL.dockerbuild
11.1 KB
shortlink-org~shortlink~WAYFGE.dockerbuild
11.1 KB