Skip to content

chore(deps): update dependency @types/node to v20.16.8 (#18365) #18323

chore(deps): update dependency @types/node to v20.16.8 (#18365)

chore(deps): update dependency @types/node to v20.16.8 (#18365) #18323

Triggered via push September 25, 2024 22:20
Status Failure
Total duration 3m 47s
Artifacts 3

docker.yml

on: push
Matrix: Docker Build, Tag, Push
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Docker Build, Tag, Push (csi)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c CGO_ENABLED=0 GOOS=$TARGETOS GOARCH=$TARGETARCH go build -a -pgo=${PGO_PATH} -gcflags=\"${SKAFFOLD_GO_GCFLAGS}\" -ldflags \"-s -w -X main.CI_COMMIT_TAG=$CI_COMMIT_TAG\" -installsuffix cgo -trimpath -o app $CMD_PATH" did not complete successfully: exit code: 1
Docker Build, Tag, Push (link)
The job was canceled because "csi" failed.
Docker Build, Tag, Push (link)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c CGO_ENABLED=0 GOOS=$TARGETOS GOARCH=$TARGETARCH go build -a -pgo=${PGO_PATH} -gcflags=\"${SKAFFOLD_GO_GCFLAGS}\" -ldflags \"-s -w -X main.CI_COMMIT_TAG=$CI_COMMIT_TAG\" -installsuffix cgo -trimpath -o app $CMD_PATH" did not complete successfully: exit code: 1
Docker Build, Tag, Push (logger)
The job was canceled because "csi" failed.
Docker Build, Tag, Push (logger)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c CGO_ENABLED=0 GOOS=$TARGETOS GOARCH=$TARGETARCH go build -a -pgo=${PGO_PATH} -gcflags=\"${SKAFFOLD_GO_GCFLAGS}\" -ldflags \"-s -w -X main.CI_COMMIT_TAG=$CI_COMMIT_TAG\" -installsuffix cgo -trimpath -o app $CMD_PATH" did not complete successfully: exit code: 1
Docker Build, Tag, Push (metadata)
The job was canceled because "csi" failed.
Docker Build, Tag, Push (metadata)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
shortlink-org~shortlink~0XLP7N.dockerbuild
10.9 KB
shortlink-org~shortlink~9D72V8.dockerbuild
11 KB
shortlink-org~shortlink~KRFJL8.dockerbuild
11 KB