Notifications
You must be signed in to change notification settings - Fork 92
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
- Loading branch information
Showing
3 changed files
with
110 additions
and
75 deletions.
There are no files selected for viewing
This file was deleted.
Oops, something went wrong.
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,109 @@ | ||
# Scheduler | ||
|
||
This guide gives an overview of how the scheduler is implemented. | ||
|
||
## Overview | ||
|
||
The {ruby Async::Scheduler} uses an event loop to execute tasks. When tasks are waiting on blocking operations like IO, the scheduler will use the operating system's native event system to wait for the operation to complete. This allows the scheduler to efficiently handle many tasks. | ||
|
||
### Tasks | ||
|
||
Tasks are the building blocks of concurrent programs. They are lightweight and can be scheduled by the event loop. Tasks can be nested, and the parent task is used to determine the current reactor. Tasks behave like promises, in the sense you can wait on them to complete, and they might fail with an exception. | ||
|
||
~~~ ruby | ||
require 'async' | ||
|
||
def sleepy(duration, task: Async::Task.current) | ||
task.async do |subtask| | ||
subtask.annotate "I'm going to sleep #{duration}s..." | ||
sleep duration | ||
puts "I'm done sleeping!" | ||
end | ||
end | ||
|
||
def nested_sleepy(task: Async::Task.current) | ||
task.async do |subtask| | ||
subtask.annotate "Invoking sleepy 5 times..." | ||
5.times do |index| | ||
sleepy(index, task: subtask) | ||
end | ||
end | ||
end | ||
|
||
Async do |task| | ||
task.annotate "Invoking nested_sleepy..." | ||
subtask = nested_sleepy | ||
|
||
# Print out all running tasks in a tree: | ||
task.print_hierarchy($stderr) | ||
|
||
# Kill the subtask | ||
subtask.stop | ||
end | ||
~~~ | ||
|
||
### Thread Safety | ||
|
||
Most methods of the reactor and related tasks are not thread-safe, so you'd typically have [one reactor per thread or process](https://github.com/socketry/async-container). | ||
|
||
### Embedding Schedulers | ||
|
||
{ruby Async::Scheduler#run} will run until the reactor runs out of work to do. To run a single iteration of the reactor, use {ruby Async::Scheduler#run_once}. | ||
|
||
~~~ ruby | ||
require 'async' | ||
|
||
Console.logger.debug! | ||
reactor = Async::Scheduler.new | ||
|
||
# Run the reactor for 1 second: | ||
reactor.async do |task| | ||
task.sleep 1 | ||
puts "Finished!" | ||
end | ||
|
||
while reactor.run_once | ||
# Round and round we go! | ||
end | ||
~~~ | ||
|
||
You can use this approach to embed the reactor in another event loop. For some integrations, you may want to specify the maximum time to wait to {ruby Async::Scheduler#run_once}. | ||
|
||
### Stopping a Scheduler | ||
|
||
{ruby Async::Scheduler#stop} will stop the current scheduler and all children tasks. | ||
|
||
### Fiber Scheduler Integration | ||
|
||
In order to integrate with native Ruby blocking operations, the {ruby Async::Scheduler} uses a {ruby Fiber::Scheduler} interface. | ||
|
||
```ruby | ||
require 'async' | ||
|
||
scheduler = Async::Scheduler.new | ||
Fiber.set_scheduler(scheduler) | ||
|
||
Fiber.schedule do | ||
puts "Hello World!" | ||
end | ||
``` | ||
|
||
## Design | ||
|
||
### Optimistic vs Pessimistic Scheduling | ||
|
||
There are two main strategies for scheduling tasks: optimistic and pessimistic. An optimistic scheduler is usually greedy and will try to execute tasks as soon as they are scheduled using a direct transfer of control flow. A pessimistic scheduler will schedule tasks into the event loop ready list and will only execute them on the next iteration of the event loop. | ||
|
||
```ruby | ||
Async do | ||
puts "Hello " | ||
|
||
Async do | ||
puts "World" | ||
end | ||
|
||
puts "!" | ||
end | ||
``` | ||
|
||
An optimstic scheduler will print "Hello World!", while a pessimistic scheduler will print "Hello !World". In practice you should not design your code to rely on the order of execution, but it's important to understand the difference. It is an unspecifed implementation detail of the scheduler. |