Skip to content

Pin uv to 0.5.2 due to breakage in astral-sh/uv#9094 #795

Pin uv to 0.5.2 due to breakage in astral-sh/uv#9094

Pin uv to 0.5.2 due to breakage in astral-sh/uv#9094 #795

Triggered via push November 21, 2024 00:31
Status Failure
Total duration 8m 10s
Artifacts 2

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

13 errors
test (ubuntu-22.04, 3.11): tests/test_boilercv.py#L11
test_stages[get_thermal_data] KeyError: "['$\\\\mathsf{Highlight}$'] not in index"
test (ubuntu-22.04, 3.11)
Process completed with exit code 1.
test (windows-2022, 3.12)
The job was canceled because "ubuntu-22_04_3_11" failed.
test (windows-2022, 3.12)
The operation was canceled.
test (windows-2022, 3.11)
The job was canceled because "ubuntu-22_04_3_11" failed.
test (windows-2022, 3.11)
The operation was canceled.
test (ubuntu-22.04, 3.12)
The job was canceled because "ubuntu-22_04_3_11" failed.
test (ubuntu-22.04, 3.12)
The operation was canceled.
test (macos-14, 3.11)
The job was canceled because "ubuntu-22_04_3_11" failed.
test (macos-14, 3.11): tests/test_boilercv.py#L11
test_stages[get_thermal_data] KeyError: "['$\\\\mathsf{Highlight}$'] not in index"
test (macos-14, 3.11)
The operation was canceled.
test (macos-14, 3.12)
The job was canceled because "ubuntu-22_04_3_11" failed.
test (macos-14, 3.12)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
github-pages Expired
273 MB
lock
179 KB