Skip to content

Commit

Permalink
Auto-generated commit
Browse files Browse the repository at this point in the history
  • Loading branch information
stdlib-bot committed Aug 16, 2024
1 parent 1dbde59 commit 5c5c2d6
Show file tree
Hide file tree
Showing 20 changed files with 259 additions and 44 deletions.
29 changes: 23 additions & 6 deletions .gitattributes
Original file line number Diff line number Diff line change
Expand Up @@ -40,10 +40,27 @@
*.mov binary

# Override what is considered "vendored" by GitHub's linguist:
/deps/** linguist-vendored=false
/lib/node_modules/** linguist-vendored=false linguist-generated=false
test/fixtures/** linguist-vendored=false
tools/** linguist-vendored=false
/lib/node_modules/** -linguist-vendored -linguist-generated

# Override what is considered "documentation" by GitHub's linguist:
examples/** linguist-documentation=false
# Configure directories which should *not* be included in GitHub language statistics:
/deps/** linguist-vendored
/dist/** linguist-generated
/workshops/** linguist-vendored

benchmark/** linguist-vendored
docs/* linguist-documentation
etc/** linguist-vendored
examples/** linguist-documentation
scripts/** linguist-vendored
test/** linguist-vendored
tools/** linguist-vendored

# Configure files which should *not* be included in GitHub language statistics:
Makefile linguist-vendored
*.mk linguist-vendored
*.jl linguist-vendored
*.py linguist-vendored
*.R linguist-vendored

# Configure files which should be included in GitHub language statistics:
docs/types/*.d.ts -linguist-documentation
23 changes: 10 additions & 13 deletions .github/workflows/productionize.yml
Original file line number Diff line number Diff line change
Expand Up @@ -94,8 +94,8 @@ jobs:
node -e "var pkg = require( './package.json' ); pkg.dependencies[ '@stdlib/error-tools-fmtprodmsg' ] = '^$PKG_VERSION'; require( 'fs' ).writeFileSync( 'package.json', JSON.stringify( pkg, null, 2 ) );"
fi
# Configure git:
- name: 'Configure git'
# Configure Git:
- name: 'Configure Git'
run: |
git config --local user.email "noreply@stdlib.io"
git config --local user.name "stdlib-bot"
Expand Down Expand Up @@ -191,8 +191,8 @@ jobs:
# Pin action to full length commit SHA
uses: actions/checkout@8ade135a41bc03ea155e62e844d188df1ea18608 # v4.1.0

# Configure git:
- name: 'Configure git'
# Configure Git:
- name: 'Configure Git'
run: |
git config --local user.email "noreply@stdlib.io"
git config --local user.name "stdlib-bot"
Expand Down Expand Up @@ -344,7 +344,6 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()

Expand All @@ -367,8 +366,8 @@ jobs:
# Pin action to full length commit SHA
uses: actions/checkout@8ade135a41bc03ea155e62e844d188df1ea18608 # v4.1.0

# Configure git:
- name: 'Configure git'
# Configure Git:
- name: 'Configure Git'
run: |
git config --local user.email "noreply@stdlib.io"
git config --local user.name "stdlib-bot"
Expand Down Expand Up @@ -518,7 +517,6 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()

Expand All @@ -541,8 +539,8 @@ jobs:
# Pin action to full length commit SHA
uses: actions/checkout@8ade135a41bc03ea155e62e844d188df1ea18608 # v4.1.0

# Configure git:
- name: 'Configure git'
# Configure Git:
- name: 'Configure Git'
run: |
git config --local user.email "noreply@stdlib.io"
git config --local user.name "stdlib-bot"
Expand Down Expand Up @@ -698,7 +696,6 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()

Expand Down Expand Up @@ -738,8 +735,8 @@ jobs:
echo "bump=true" >> $GITHUB_OUTPUT
fi
# Configure git:
- name: 'Configure git'
# Configure Git:
- name: 'Configure Git'
if: steps.check-if-bump.outputs.bump
run: |
git config --local user.email "noreply@stdlib.io"
Expand Down
11 changes: 7 additions & 4 deletions .github/workflows/publish.yml
Original file line number Diff line number Diff line change
Expand Up @@ -72,8 +72,8 @@ jobs:
node-version: 20
timeout-minutes: 5

# Configure git:
- name: 'Configure git'
# Configure Git:
- name: 'Configure Git'
run: |
git config --local user.email "noreply@stdlib.io"
git config --local user.name "stdlib-bot"
Expand All @@ -94,6 +94,10 @@ jobs:
# Replace branch in README.md link definitions for badges with the new version:
find . -type f -name '*.md' -print0 | xargs -0 sed -Ei "s/branch([=:])[^ ]+/branch\1v${NEW_VERSION}/g"
# Rewrite CHANGELOG.md to replace "Unreleased" with the new version:
sed -Ei "s/Unreleased/${NEW_VERSION}/g" CHANGELOG.md
sed -Ei "s/unreleased/v${NEW_VERSION}/g" CHANGELOG.md
# Create a new commit and tag:
git add package.json README.md
git commit -m "Release v${NEW_VERSION}"
Expand Down Expand Up @@ -202,7 +206,7 @@ jobs:
# Publish package to npm:
- name: 'Publish package to npm'
# Pin action to full length commit SHA
uses: JS-DevTools/npm-publish@4b07b26a2f6e0a51846e1870223e545bae91c552 # v3.0.1
uses: JS-DevTools/npm-publish@19c28f1ef146469e409470805ea4279d47c3d35c # v3.1.1
with:
token: ${{ secrets.NPM_TOKEN }}
access: public
Expand All @@ -218,7 +222,6 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()

Expand Down
1 change: 0 additions & 1 deletion .github/workflows/test.yml
Original file line number Diff line number Diff line change
Expand Up @@ -95,6 +95,5 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()
3 changes: 0 additions & 3 deletions .github/workflows/test_bundles.yml
Original file line number Diff line number Diff line change
Expand Up @@ -94,7 +94,6 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()

Expand Down Expand Up @@ -139,7 +138,6 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()

Expand Down Expand Up @@ -184,6 +182,5 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()
1 change: 0 additions & 1 deletion .github/workflows/test_coverage.yml
Original file line number Diff line number Diff line change
Expand Up @@ -119,7 +119,6 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()

Expand Down
1 change: 0 additions & 1 deletion .github/workflows/test_install.yml
Original file line number Diff line number Diff line change
Expand Up @@ -81,6 +81,5 @@ jobs:
uses: 8398a7/action-slack@28ba43ae48961b90635b50953d216767a6bea486 # v3.16.2
with:
status: ${{ job.status }}
steps: ${{ toJson(steps) }}
channel: '#npm-ci'
if: failure()
2 changes: 2 additions & 0 deletions .gitignore
Original file line number Diff line number Diff line change
Expand Up @@ -101,6 +101,8 @@ docs/**/node_modules/
pids
*.pid
*.seed
yarn.lock
package-lock.json

# Typescript #
##############
Expand Down
4 changes: 2 additions & 2 deletions .npmrc
Original file line number Diff line number Diff line change
Expand Up @@ -27,5 +27,5 @@ shrinkwrap = false
# Disable automatically "saving" dependencies on install:
save = false

# Generate provenance metadata:
provenance = true
# Do not generate provenance metadata:
provenance = false
161 changes: 160 additions & 1 deletion CHANGELOG.md
Original file line number Diff line number Diff line change
Expand Up @@ -2,4 +2,163 @@

> Package changelog.
See [GitHub Releases](https://github.com/stdlib-js/ndarray-base-unary-loop-interchange-order/releases) for the changelog.
<section class="release" id="unreleased">

## Unreleased (2024-08-16)

<section class="features">

### Features

- [`0d360b3`](https://github.com/stdlib-js/stdlib/commit/0d360b33eba8019d2d638f265986d861ed22642a) - return index array as part of the results object

</section>

<!-- /.features -->

<section class="commits">

### Commits

<details>

- [`0d360b3`](https://github.com/stdlib-js/stdlib/commit/0d360b33eba8019d2d638f265986d861ed22642a) - **feat:** return index array as part of the results object _(by Athan Reines)_

</details>

</section>

<!-- /.commits -->

<section class="contributors">

### Contributors

A total of 1 person contributed to this release. Thank you to this contributor:

- Athan Reines

</section>

<!-- /.contributors -->

</section>

<!-- /.release -->

<section class="release" id="v0.2.1">

## 0.2.1 (2024-02-25)

No changes reported for this release.

</section>

<!-- /.release -->

<section class="release" id="v0.2.0">

## 0.2.0 (2024-02-15)

<section class="commits">

### Commits

<details>

- [`30e3541`](https://github.com/stdlib-js/stdlib/commit/30e35413446e1f46eb385bb811db2297bfc66bb0) - **refactor:** update require path _(by Athan Reines)_
- [`8c8e3d1`](https://github.com/stdlib-js/stdlib/commit/8c8e3d15f6698c81c75fc94fa10a7e2b9fb8b5d9) - **docs:** update links _(by Athan Reines)_
- [`453dd85`](https://github.com/stdlib-js/stdlib/commit/453dd85b5dd186d2b4d458256fe84906e1503fe2) - **build:** remove tslint directives _(by Philipp Burckhardt)_

</details>

</section>

<!-- /.commits -->

<section class="contributors">

### Contributors

A total of 2 people contributed to this release. Thank you to the following contributors:

- Athan Reines
- Philipp Burckhardt

</section>

<!-- /.contributors -->

</section>

<!-- /.release -->

<section class="release" id="v0.1.0">

## 0.1.0 (2023-09-24)

<section class="features">

### Features

- [`7ae5741`](https://github.com/stdlib-js/stdlib/commit/7ae574143c9716c82cea6cbf839a20b70a9cdfe0) - update minimum TypeScript version

</section>

<!-- /.features -->

<section class="breaking-changes">

### BREAKING CHANGES

- [`7ae5741`](https://github.com/stdlib-js/stdlib/commit/7ae574143c9716c82cea6cbf839a20b70a9cdfe0): update minimum TypeScript version to 4.1

- To migrate, users should upgrade their TypeScript version to at least version 4.1.

</section>

<!-- /.breaking-changes -->

<section class="commits">

### Commits

<details>

- [`7ae5741`](https://github.com/stdlib-js/stdlib/commit/7ae574143c9716c82cea6cbf839a20b70a9cdfe0) - **feat:** update minimum TypeScript version _(by Philipp Burckhardt)_
- [`80b8444`](https://github.com/stdlib-js/stdlib/commit/80b8444ae4991062d8961b2a020d24c2fe7a8a48) - **docs:** fix typo _(by Athan Reines)_
- [`8df288a`](https://github.com/stdlib-js/stdlib/commit/8df288ad176e2b374f61112a37091b47462f0ec5) - **docs:** fix comment _(by Athan Reines)_

</details>

</section>

<!-- /.commits -->

<section class="contributors">

### Contributors

A total of 2 people contributed to this release. Thank you to the following contributors:

- Athan Reines
- Philipp Burckhardt

</section>

<!-- /.contributors -->

</section>

<!-- /.release -->

<section class="release" id="v0.0.1">

## 0.0.1 (2023-02-02)

No changes reported for this release.

</section>

<!-- /.release -->

Loading

0 comments on commit 5c5c2d6

Please sign in to comment.