Skip to content
Triggered via push February 25, 2024 16:23
Status Failure
Total duration 55s
Billable time 8m
Artifacts

run-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
P8.1 - L10.* - prefer-lowest - ubuntu-latest
Process completed with exit code 255.
P8.1 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_1_10___pr" failed.
P8.1 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_1_10___pr" failed.
P8.2 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.1 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_1_10___pr" failed.
P8.1 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_1_10___pr" failed.
P8.2 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.1 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_1_10___pr" failed.
P8.1 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_1_10___pr" failed.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_1_10___pr" failed.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.