Skip to content

chore(main): release taiko-client 0.39.2 #1350

chore(main): release taiko-client 0.39.2

chore(main): release taiko-client 0.39.2 #1350

Triggered via pull request October 24, 2024 12:35
Status Failure
Total duration 15m 23s
Artifacts

taiko-client--test.yml

on: pull_request
Matrix: Integration tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Integration tests (l2_geth)
The job running on runner GitHub Actions 21 has exceeded the maximum execution time of 15 minutes.
Integration tests (l2_geth)
The operation was canceled.
Integration tests (l2_reth)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 15 minutes.
Integration tests (l2_reth)
The operation was canceled.