all: use wasm-tools-go@v0.2.0 #5165
linux.yml
on: pull_request
build-linux
5m 2s
assert-test-linux
8m 7s
test-linux-build
2m 58s
Matrix: build-linux-cross
Annotations
8 errors
assert-test-linux
Canceling since a higher priority waiting request for 'Linux-refs/pull/4456/merge' exists
|
assert-test-linux
The operation was canceled.
|
build-linux-cross (arm)
Canceling since a higher priority waiting request for 'Linux-refs/pull/4456/merge' exists
|
build-linux-cross (arm)
The operation was canceled.
|
build-linux-cross (arm64)
Canceling since a higher priority waiting request for 'Linux-refs/pull/4456/merge' exists
|
build-linux-cross (arm64)
The operation was canceled.
|
test-linux-build
Canceling since a higher priority waiting request for 'Linux-refs/pull/4456/merge' exists
|
test-linux-build
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
linux-amd64-double-zipped
|
262 MB |
|