ICU-22511 collator hang in comparison #2673
Open
Azure Pipelines / CI-ICU4C (C: MSVC 64-bit Release (VS 2022) + Distrelease)
cancelled
Jul 1, 2024 in 30m 10s
C: MSVC 64-bit Release (VS 2022) + Distrelease was canceled
Annotations
Check failure on line 4786 in Build log
azure-pipelines / CI-ICU4C (C: MSVC 64-bit Release (VS 2022) + Distrelease)
Build log #L4786
The Operation will be canceled. The next steps may not contain expected logs.
Check failure on line 4799 in Build log
azure-pipelines / CI-ICU4C (C: MSVC 64-bit Release (VS 2022) + Distrelease)
Build log #L4799
The operation was canceled.
Loading