Skip to content

wip

wip #53

Triggered via push May 21, 2024 23:03
Status Failure
Total duration 37s
Artifacts

main.yml

on: push
Golang CI Lint
24s
Golang CI Lint
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

13 errors and 5 warnings
Tests (5): main.go#L8
no required module provides package github.com/victorguarana/gomongo/gomongo; to add it:
Tests (5)
Process completed with exit code 1.
Tests (6): main.go#L8
no required module provides package github.com/victorguarana/gomongo/gomongo; to add it:
Tests (6)
Process completed with exit code 1.
Tests (4.4)
The job was canceled because "_5" failed.
Tests (4.4): main.go#L8
no required module provides package github.com/victorguarana/gomongo/gomongo; to add it:
Tests (4.4)
Process completed with exit code 1.
Golang CI Lint: collection.go#L1
: found packages gomongo (collection.go) and main (main.go) in (typecheck)
Golang CI Lint: collection_test.go#L11
could not import github.com/victorguarana/gomongo (-: found packages gomongo (collection.go) and main (main.go) in ) (typecheck)
Golang CI Lint
issues found
Tests (7)
The job was canceled because "_5" failed.
Tests (7): main.go#L8
no required module provides package github.com/victorguarana/gomongo/gomongo; to add it:
Tests (7)
The operation was canceled.
Tests (5)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Tests (6)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Tests (4.4)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Golang CI Lint
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Tests (7)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2