Skip to content

chore: move als test resources out of the base #12717

chore: move als test resources out of the base

chore: move als test resources out of the base #12717

Triggered via pull request July 16, 2024 03:05
Status Failure
Total duration 47m 1s
Artifacts 1

build_and_test.yaml

on: pull_request
Matrix: conformance-test
Matrix: e2e-test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

8 errors
e2e-test (v1.29.4)
Process completed with exit code 2.
e2e-test (v1.30.0)
The job was canceled because "v1_29_4" failed.
e2e-test (v1.30.0)
The operation was canceled.
e2e-test (v1.27.13)
The job was canceled because "v1_29_4" failed.
e2e-test (v1.27.13)
The operation was canceled.
e2e-test (v1.28.9)
The job was canceled because "v1_29_4" failed.
e2e-test (v1.28.9)
The operation was canceled.
benchmark-test
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
envoy-gateway
168 MB