Skip to content

chore: move als test resources out of the base #12720

chore: move als test resources out of the base

chore: move als test resources out of the base #12720

Triggered via pull request July 16, 2024 03:34
Status Failure
Total duration 43m 41s
Artifacts 1

build_and_test.yaml

on: pull_request
Matrix: conformance-test
Matrix: e2e-test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

7 errors
e2e-test (v1.28.9)
Process completed with exit code 2.
e2e-test (v1.30.0)
The job was canceled because "v1_28_9" failed.
e2e-test (v1.30.0)
The operation was canceled.
e2e-test (v1.27.13)
The job was canceled because "v1_28_9" failed.
e2e-test (v1.27.13)
The operation was canceled.
e2e-test (v1.29.4)
The job was canceled because "v1_28_9" failed.
e2e-test (v1.29.4)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
envoy-gateway
168 MB