Skip to content

move ShortName to bevy_reflect #48550

move ShortName to bevy_reflect

move ShortName to bevy_reflect #48550

Triggered via pull request September 21, 2024 20:29
Status Cancelled
Total duration 3m 48s
Artifacts

ci.yml

on: pull_request
Matrix: build
check-missing-examples-in-docs
35s
check-missing-examples-in-docs
build-wasm
0s
build-wasm
build-wasm-atomics
0s
build-wasm-atomics
msrv
0s
msrv
check-compiles
0s
check-compiles
check-missing-features-in-docs
29s
check-missing-features-in-docs
Fit to window
Zoom out
Zoom in

Annotations

17 errors
ci
Process completed with exit code 101.
check-missing-features-in-docs
Canceling since a higher priority waiting request for 'CI-refs/pull/15340/merge' exists
check-missing-features-in-docs
The operation was canceled.
build (windows-latest)
Canceling since a higher priority waiting request for 'CI-refs/pull/15340/merge' exists
build (windows-latest)
The operation was canceled.
check-doc
Canceling since a higher priority waiting request for 'CI-refs/pull/15340/merge' exists
check-doc
The operation was canceled.
miri
Canceling since a higher priority waiting request for 'CI-refs/pull/15340/merge' exists
miri
The operation was canceled.
toml
Canceling since a higher priority waiting request for 'CI-refs/pull/15340/merge' exists
toml
The operation was canceled.
build (ubuntu-latest)
Canceling since a higher priority waiting request for 'CI-refs/pull/15340/merge' exists
build (ubuntu-latest)
The operation was canceled.
run-examples-macos-metal
Canceling since a higher priority waiting request for 'CI-refs/pull/15340/merge' exists
run-examples-macos-metal
The operation was canceled.
build (macos-latest)
Canceling since a higher priority waiting request for 'CI-refs/pull/15340/merge' exists
build (macos-latest)
The operation was canceled.